Wednesday 11th & Thursday 12th June |
It’s back to normal at the site and we are playing a massive catch up to make up for the bad weather and the Flugtag festivities, but I still want to wear a cape and jump off things?
Some of the windows that have been surveyed should be here towards the weekend so I have a few jobs to do to prepare the openings. These being cavity closers on the side & bottom within the cavity openings – the lintel takes care of the top elevation and some lead to affix for the dormers.
There are still the sprocket details of the roof to finish so the Fox and I will try pick these off too.
So basically loads of little bits to pick off but boy are they time consuming.
|