|
Friday 30th & Saturday 31st May |
The rear roof for the kitchen is ready so Henry will be picking off loads of little bits that have been left for various reasons and also getting the first few stone window sills ready and fitted. It’s a combo job with me cutting with the petrol disk cutter and Henry fixing – with a little bit of lorry carrying – a winning combo?
There’s load of Celotex needs doing in the loft area which Lorry has been tackling, this is quite a time consuming job and can be a real pain. Remember to leave some floor boards up so you can get the 8ft x 4ft sheets up as these babies are 120mm thick.
The Saturday club as we call it is hard work but as you can see we take it seriously and can’t stand each other!
|