Menu Content/Inhalt

Video by WL Digital
 
Home Exteriors Planning Pre-Build Win Prizes! About Gavin Chat with GavinWall of Fame The Big Build Diary
Tuesday 22nd – Friday 25th October

Click image to open!
Click image to open!
Click image to open!
Click image to open!

After a long weekend off from the project and the winter months upon us its all about finishing the roof.

Hinge & Bracket are back – thanks lads – and they are finishing off all the tricky bits and weather proofing around the solar panels.

The chimney stack with all its lead work also needs to be finished – or dressed as the boys say. Dressing lead involves whacking it with a tool which looks like a big shoe horn?

The soil pipe for the waste drainage also needs a lead apron around it for weathering purposes as this pipe has to be here for airflow and it is something that will be checked by building control.

All in all I’m very glad we have reached this stage and look forward to getting the last bit of scaffolding down – its taken a little longer (well quite a bit) than I first projected but I have got the roof tiles I wanted and the all important solar panels

 

The Big Build Video Channel!

Loading...
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
The Big Build Webcam (refreshes every 10 secs)


© 2010 Gavin Lowe - The Big Build
This website has been built to work best with Microsoft's Internet Explorer 7 and above (and preferably at 1024 wide). Whilst every effort has been made to check browser compatibility, We can take no responsibility for an individual's PC or Mac browser settings.
website by 3B Web Design