Menu Content/Inhalt

Video by WL Digital
 
Home Exteriors Planning Pre-Build Win Prizes! About Gavin Chat with GavinWall of Fame The Big Build Diary
Wednesday 10th, Thursday 11th & Friday 12th Sept

Click image to open!
Click image to open!
Click image to open!
Click image to open!

Just trying to finish the tiling in the top floor bathroom ready for the floor changeover.
The idea here is to vacate the middle floor so that work can commence here getting everything ready for the plastering, re-wire, new heating etc etc etc.

The shower cubicle has been taken into the eaves of the room to make it as big as possible with a shower light and extractor internal.
The cubicle is 1200 x 900 mm which is over size anyway but it will only have a 900mm pivot door because of the sloping ceiling. I still think this is bit as a standard shower tray is 760 x 760 mm.

I have also taken the opportunity of incorporating some storage in the cubicle in the form of a couple of marine ply boxes.
The idea behind these is that all the shampoo’s and stuff can be stored on these tiled shelves and be cleaned the same way as the shower is cleaned giving uncomplicated storage solutions.
Now all I’ve got to do is get it finished.

 

The Big Build Video Channel!

Loading...
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
The Big Build Webcam (refreshes every 10 secs)


© 2010 Gavin Lowe - The Big Build
This website has been built to work best with Microsoft's Internet Explorer 7 and above (and preferably at 1024 wide). Whilst every effort has been made to check browser compatibility, We can take no responsibility for an individual's PC or Mac browser settings.
website by 3B Web Design