Menu Content/Inhalt

Video by WL Digital
 
Home Exteriors Planning Pre-Build Win Prizes! About Gavin Chat with GavinWall of Fame The Big Build Diary
Monday 8th & Tuesday 9th September

Click image to open!
Click image to open!

Im starting to get on with bed 4 en-suite a bit now although starting to do things slightly out of sync.
The floor here, again which is travertine stone, is affixed before the wall tiles due to the underfloor heating ribbon wire system. This is the mat system from Osma which is rolled out and stuck to the marine ply before having the tiles fixed to this. Do remember always use a flexible adhesive when sticking tiles on any type of underfloor heating – im using the white adhesive that’s for stone & is rapid set as well as flexible – it’s the best option!

 

The Big Build Video Channel!

Loading...
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
The Big Build Webcam (refreshes every 10 secs)


© 2010 Gavin Lowe - The Big Build
This website has been built to work best with Microsoft's Internet Explorer 7 and above (and preferably at 1024 wide). Whilst every effort has been made to check browser compatibility, We can take no responsibility for an individual's PC or Mac browser settings.
website by 3B Web Design