Menu Content/Inhalt

Video by WL Digital
 
Home Exteriors Planning Pre-Build Win Prizes! About Gavin Chat with GavinWall of Fame The Big Build Diary
Saturday 6th September
Click image to open!
Click image to open!
Click image to open!

Lorry's about so the mixers working overtime.

The rear drainage & rain water pipes are in and the patio hardcored area has been prepped with concrete being the next step.

The hardcore, recycled from the build, has been broken up and covered with a blinding coat of sand before being flattened & compacted using a whacker plate.

Then a base of around 40-50mm of concrete has been tampered on top to give the best possible base for paving onto - it all takes time but we are having fun.
No really we are!
 

The Big Build Video Channel!

Loading...
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
The Big Build Webcam (refreshes every 10 secs)


© 2010 Gavin Lowe - The Big Build
This website has been built to work best with Microsoft's Internet Explorer 7 and above (and preferably at 1024 wide). Whilst every effort has been made to check browser compatibility, We can take no responsibility for an individual's PC or Mac browser settings.
website by 3B Web Design