With other work and a dodgy weather report it’s just a little bit done ready for the weekend. The patio area is further prepped and the remaining waste water and soak away Osma fittings are sourced so that all these will go under the surface and a water main is added for the BBQ area.
The soak away main part – the crates – have already been passed by building control as these were dug and piped when we had the mini digger so its just a case of getting the down pipes over to them. Lolly has done his footing for the rest of the retaining wall so there will be some more concrete blocks going in too
|