Menu Content/Inhalt

Video by WL Digital
 
Home Exteriors Planning Pre-Build Win Prizes! About Gavin Chat with GavinWall of Fame The Big Build Diary
Wednesday 13th & Thursday 14th August

Click image to open!
Click image to open!

With other work and a dodgy weather report it’s just a little bit done ready for the weekend. The patio area is further prepped and the remaining waste water and soak away Osma fittings are sourced so that all these will go under the surface and a water main is added for the BBQ area.
The soak away main part – the crates – have already been passed by building control as these were dug and piped when we had the mini digger so its just a case of getting the down pipes over to them. Lolly has done his footing for the rest of the retaining wall so there will be some more concrete blocks going in too

 

The Big Build Video Channel!

Loading...
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
The Big Build Webcam (refreshes every 10 secs)


© 2010 Gavin Lowe - The Big Build
This website has been built to work best with Microsoft's Internet Explorer 7 and above (and preferably at 1024 wide). Whilst every effort has been made to check browser compatibility, We can take no responsibility for an individual's PC or Mac browser settings.
website by 3B Web Design