Menu Content/Inhalt

Video by WL Digital
 
Home Exteriors Planning Pre-Build Win Prizes! About Gavin Chat with GavinWall of Fame The Big Build Diary
Thursday 7th & Friday 8th August

Click image to open!
Click image to open!
Click image to open!

Today I will mostly be knocking stuff down! Well there is a hole to make ready for a window. The outside has already been removed a couple of weeks ago and the external lintel fitted.
Now its time to do the knock through on the inside.
The joists in the room above do not affect the opening and the lintel hole is cut out first and the lintel fitted before the rest of the opening is made.

The blocks are what’s called cinta / clinka blocks which are an early form of breeze blocks made from fused concrete. They are quite heavy and usually break up whilst trying to remove them and the dust gets every where – so tape up the doors and cover everything. Silver fox is doing the last bits for the flat roof so its time to give him a hand and wait for the window fitter.

 

The Big Build Video Channel!

Loading...
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
The Big Build Webcam (refreshes every 10 secs)


© 2010 Gavin Lowe - The Big Build
This website has been built to work best with Microsoft's Internet Explorer 7 and above (and preferably at 1024 wide). Whilst every effort has been made to check browser compatibility, We can take no responsibility for an individual's PC or Mac browser settings.
website by 3B Web Design