Friday 18th & Monday 21st July

Click image to open!
Click image to open!
Click image to open!

Its all about the windows……………….they are here and the site has been tied up ready for there arrival. The windows and glass can go into all the builders’ openings that have been prepared. Also the rear lounge door knock through can be tackled too.
This opening was formed way back when Henry re-skinned the house with the Ibstock bricks and the lintel was cut in but the inner skin was left in rather than have an opening to the house left to the elements.
The construction was brick and concrete block so it took a bit of shifting but I got it ready for Biggins boys to fit the French doors.
Whilst I was doing this the front bay, side chimney wall windows and the sand blasted rear en-suite for bed 4 were put in – all in all getting there.
The painters are in later this week for the loft rooms so its pretty much a free rain for them internally!

 

The Big Build Video Channel!

Loading...
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
The Big Build Webcam (refreshes every 10 secs)


© 2010 Gavin Lowe - The Big Build
This website has been built to work best with Microsoft's Internet Explorer 7 and above (and preferably at 1024 wide). Whilst every effort has been made to check browser compatibility, We can take no responsibility for an individual's PC or Mac browser settings.
website by 3B Web Design