Menu Content/Inhalt

Video by WL Digital
 
Home Exteriors Planning Pre-Build Win Prizes! About Gavin Chat with GavinWall of Fame The Big Build Diary
Monday 14th & Tuesday 15th July

Click image to open!
Click image to open!
Click image to open!

The Hoff has been fitting the Loo and basin for the top floor bathroom and doing all the connections for the waste pipes. The shower and bath piggie back each other and go directly into a 4” soil stack whilst the basin couples on at the rear of the loo and then out. A “durgo” air vent has been used for this bathroom with the final / furthest bathroom being vented out of the roof at the rear of bed 4.
There is going to be a tiled up stand of about 90mm around all of the bathroom done in the same Travertine  but it was easier to let Hoff fit everything first to make sure that the soil pipes would go in easy – anyway he gets married in 2 weeks he’s got enough on his plate.
The shower cubicle it self is 1400mm x 900mm and will be tiled to the ceiling in travertine mosaics in exactly the same color way – this will be time consuming but will look great when finished – trust me.

 

The Big Build Video Channel!

Loading...
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
The Big Build Webcam (refreshes every 10 secs)


© 2010 Gavin Lowe - The Big Build
This website has been built to work best with Microsoft's Internet Explorer 7 and above (and preferably at 1024 wide). Whilst every effort has been made to check browser compatibility, We can take no responsibility for an individual's PC or Mac browser settings.
website by 3B Web Design